Test with confidence, report with ease

Write test procedures, schedule runs, log results, and trace everything back to requirements, with audit-ready reports in a click.

Book a demo

How it works

Four steps from a test plan to an audit-ready report, all traced to the requirements they verify.

STEP 01

Plan your test campaign

Create test cases with automatic IDs, set their type and purpose, and link each one to the parts under test and the requirements it verifies, with a rationale for every link.

Test case list for a launch vehicle, from an engine static fire test to a redundant shutdown test, with parts, types and dates
STEP 02

Write the procedure

Break each test into clear steps, each with the action to take and the expected result, so anyone on the team can run it the same way.

Six-step procedure for a turbopump performance test, from installing the turbopumps to running cycles for MTBF data
STEP 03

Run it and record the results

Start a run, mark each step pass or fail, and watch the progress update. Attach test data, photos, logs and anomaly reports, and keep every retest as its own run.

Test run with pass and fail buttons for each procedure step, a progress ring, status, notes and attachments
STEP 04

Schedule and report

See every test on a timeline by facility and date, colored by status. When it's time for a review, export a report with procedures, run results and traceability.

Timeline view of launch vehicle tests scheduled across December, colored by lifecycle status

Key capabilities

  • Step-by-step test procedures
  • Pass/fail recording with evidence attachments
  • Multiple test runs per test case
  • Timeline and list views
  • Traceability to requirements and parts
  • Test report generation for audits

Connected to the rest of your model

Tests don't live in a separate spreadsheet. Each one links to the requirements it verifies and the parts it covers, so you can see what is verified, what is still open, and what a failed run affects.

  1. RequirementsWhat each test verifies, with a rationale per link
  2. ArchitectureThe parts under test and your coverage across them
  3. Test casesProcedures, runs, results and evidence
  4. Safety & HazardsEvidence that hazard controls work
Dalus Copilot

Let Copilot do the first draft

Dalus Copilot works on the same model. Ask it to set things up, fill gaps or check your work, then review what it changed.

More about Dalus Copilot
Create test cases for every requirement on the propulsion system
Write a step-by-step procedure for a thermal vacuum test of the battery pack
Which requirements have no test case linked yet?
Summarize the failed runs from this month

“Dalus helped us bring structure and traceability to our IoT system development”

Matthias Priebe

Systems Engineer, IOX Lab

  • 10xfaster requirements reviews
  • 0spreadsheets left
  • 3xfaster customer sign-off

FAQs

Everything you need to know before you get started.

Yes. Each test case can have any number of runs, for example retests or different configurations. Every run has its own status (scheduled, in progress, passed, failed or blocked) and a pass or fail result for each procedure step.

Can’t find what you’re looking for?

Contact us
Engineers working around a jet engine on a workbench

Let’s discuss your systems engineering challenges

Tell us what you’re building, and we’ll show you how Dalus can help.

Sebastian Völkl

30-minute discovery call with Sebastian

Co-founder, Dalus

No time that works? Send us a message and we’ll find one.